Steel mezzanine floor structure designed and installed by NXT Level Group
Planning and Building Regulations Guide

Mezzanine Planning Permission and Building Regulations Guide

When planning permission applies, what Building Regulations cover, and how approvals work for mezzanine floors across Kent, London and the South East.

  • Free site survey
  • Building Regulations managed
  • Kent, London & the South East
Qualified installers holding CITB, IPAF and PASMA cards, registered with SEIRS
Over 20 years designing and installing mezzanine floors
Based in Canterbury, working across Kent, London and the South East, and nationwide
In brief

Planning permission and Building Regulations are different

Adding a mezzanine floor is one of the most cost-effective ways to create extra space without moving. In most cases a mezzanine will not need planning permission, but it will almost always need Building Regulations approval. This guide explains the difference and what to expect in Kent, London and the South East.

This is general guidance, not legal advice. Rules change and every building is different, so always check with your local authority or Building Control body before you start.

Planning permission

Do you need planning permission for a mezzanine?

Mezzanine deck boards being laid over the joists, by NXT Level Group

Internal works are usually not development

Planning permission is only needed for work that counts as development. Works that only affect the inside of a building, and do not materially change how it looks from outside, are generally not development. A freestanding mezzanine sits inside the building, so it usually does not need planning permission.

When planning permission may be needed

  • Retail floorspace: internal works that add more than 200 square metres of floorspace to a shop can need planning permission. This does not apply to warehouses, factories or offices.
  • Listed buildings: works to a listed building, including internal works, may need listed building consent.
  • External changes: new windows, roof lights, loading doors or external plant may need planning permission.
  • Conditions and change of use: some sites have conditions limiting floorspace or use. Check your planning history.

Also check your lease, as landlords usually need to consent to alterations.

Building Regulations

What Building Regulations cover on a mezzanine

Dog-leg mezzanine staircase with handrails, designed to suit Part K, by NXT Level Group

A mezzanine is building work under the Building Regulations, so it needs approval from a Building Control body. The main areas checked are:

Structure (Part A)

The floor, beams, columns and connections must safely carry their loads to the ground. Structural calculations show the design suits the intended load, and the existing floor slab must be able to take the column loads.

Fire safety and means of escape (Part B)

People on the mezzanine must be able to reach an exit within set travel distances, so larger floors often need a second staircase. Many mezzanines also need fire protection, usually a fire-rated suspended ceiling, column casings and fascias. Some small storage-only floors may not, depending on their size and use. A large mezzanine can count as an extra storey, which changes the requirements for the whole building.

Access (Part M)

Where offices or public areas are added, access between levels must be considered and the building must be no less accessible afterwards. Discuss this early.

Protection from falling (Part K)

Stairs, handrails and guarding must meet Part K. Loading edges need suitable protection, such as pallet gates, which keep the edge guarded during loading. See our staircases, handrails and pallet gates.

Building Control

Local authority or registered Building Control approver

For most projects you can choose between two types of Building Control body:

  • Local authority Building Control: your council, usually applied to through the Planning Portal.
  • A registered Building Control approver: a private body registered with the Building Safety Regulator, which agrees its fees directly with you.

For most commercial premises a full plans application is needed rather than a building notice. Building Control inspects during and after installation and issues a completion certificate once satisfied.

Where you are

Mezzanine approvals in Kent, London and the South East

Mezzanine steel frame before decking, by NXT Level Group

The rules are the same across England, but who you deal with depends on where your building is.

Kent

Planning and Building Control are handled by the district and borough councils, such as Canterbury, Maidstone, Ashford and Dartford, and by Medway Council. Some councils share Building Control services, so check who covers your area.

London

Each London borough and the City of London handles planning and Building Control for its own area. Many boroughs have conservation areas and listed buildings, so check heritage status early, especially if external changes are planned.

Essex

Planning and Building Control sit with the district and borough councils and with the unitary authorities of Southend-on-Sea and Thurrock.

Sussex, Surrey and the rest of the South East

The same Building Regulations apply. Planning and Building Control sit with the local district, borough or unitary council for your building.

Wherever you are, a registered Building Control approver can be used instead of the council. See the areas we serve.

How we help

We handle the approvals for you

We manage the approvals as part of your project: the structural design and calculations, fire and escape layouts, and the Building Regulations application, plus dealing with Building Control through to sign-off. See our mezzanine design service, and our guides to mezzanine floor costs, the installation process and mezzanine floor loadings.

Google reviews

Rated 5.0 on Google

“Amazing work from Robbie and Lance very professional service would highly recommend…”
Perry Keegan
“Very good workers, accurate and well layed out designs, 2nd mez they have done for us…”
Steve Hubbard
“Nxt Level recently installed our mezzanine and I honestly cannot recommend them highly enough…”
Alex Fenner
Keep reading

More guides and services

Mezzanine floor cost guide

What drives the cost of a mezzanine, and how to compare quotes like for like.

Read the guide 

Mezzanine installation process

Every stage from free site survey to handover, with realistic timings on site.

Read the guide 

Mezzanine floors in Kent

Our full mezzanine service, from survey to handover.

Mezzanine floors 

Stairs, handrails and gates

Part K and utility staircases, handrails, pallet gates, decking and protection.

Mezzanine ancillaries 

Our projects

Photos of recent mezzanine, racking and fit-out work across Kent, London and the South East.

See our projects 

Mezzanine floor loadings

Typical design loads, UDL and point loads, explained in plain English.

Read the guide 

Common questions

Do I need planning permission for a mezzanine floor?
Usually not, if the mezzanine is inside an existing building and does not change how the building is used, but it depends on the building, its use and your lease. Retail floors, listed buildings and some estates can need consent. NXT Level Group checks this at the free site survey and tells you before any work starts.
Do mezzanine floors need Building Regulations approval?
Yes, in most cases. A mezzanine adds a new floor, so Building Control checks the structure, fire safety and escape routes (Part B), and the stairs and edge protection (Part K). NXT Level Group prepares the drawings and structural calculations and manages the application through to the completion certificate.
Does a storage mezzanine need fire protection?
Not always. Some storage-only mezzanines need none, but office floors, retail floors, larger floors and floors that affect escape routes usually do, typically through fire-rated ceilings, column casings and fascias. Building Control confirms what is required, and NXT Level Group includes it in the design and the quotation.
Who can approve my mezzanine?
Either your local authority Building Control team or a registered Building Control approver. We manage the application with whichever is used for your project.
What do I need to check in my lease?
Most leases need your landlord to consent to alterations, so check your lease and speak to your landlord early.
Do you handle the Building Regulations for me?
Yes. We prepare the drawings and structural calculations, submit the application and deal with Building Control through to the completion certificate.
What happens if a mezzanine was built without approval?
A local authority can consider a retrospective regularisation application. It is far simpler to get approval before the work starts.

Ask about your mezzanine approvals

Tell us about your building and what the floor is for, and we will advise on the approvals your project needs. Prefer to talk? Call 01227 678 128 or 0330 133 2445.

Please fill out the form below, and we will be in touch as soon as possible.
Select one option

See our privacy policy.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Plan your mezzanine with confidence

Our qualified installers build every mezzanine to meet the Building Regulations in England. Book a free site survey and we will advise on the approvals you need. Call us Monday to Friday 8:00 to 17:30, closed weekends, or email info@nxtlevelgroup.co.uk.

Contact us

NXT Level Group
6-8 Longmarket
Canterbury, Kent CT1 2JS
Phone
01227 678 1280330 133 2445
Email
info@nxtlevelgroup.co.uk
Opening hours
Monday to Friday 8:00 to 17:30, closed weekends

Follow us

Areas we cover: Canterbury · Ashford · Maidstone · Medway · Dartford · Folkestone · Dover · Margate and Thanet · Sevenoaks · Tonbridge · Tunbridge Wells · Erith · Bexley · Thurrock · Basildon · All areas